Phase 1 Included the construction of the new 40,000+ sq. ft. Center for Science and Discovery (which opened around late 2025 / early 2026) along with a 500+ space parking garage with retail space and a large green space.
Scope: Install Fluid air barrier to exterior walls of gyp sheathing and cmu locations. WR Meadows LSR was air barrier used.


